
Surveying Cullompton’s Flood Ponds
Kemp has recently completed six weeks of surveying works in Cullompton, supporting the construction of two new flood ponds as
Many ongoing projects to concentrate on this month, such as Penryn Campus and the Cranbrook housing project.
On other fronts, lots of interesting and varied jobs and locations. From hospitals to airports and estuaries to clifftops.
The wet weather gear was back in action as the weather started to deteriorate, because wind and rain doesn’t interfere with our surveys.

Kemp has recently completed six weeks of surveying works in Cullompton, supporting the construction of two new flood ponds as

Construction projects rarely finish exactly as they were originally designed. Changes made on site, whether due to ground conditions, design

Before the first foundation is poured or a single structure is built, it’s essential to understand exactly what’s on site.
Kemp Engineering & Surveying and Seeka Utility Surveys are trusted specialists in precision surveying, engineering, and utility mapping. With decades of expertise, we deliver accurate data and tailored solutions to support infrastructure, construction, and development projects across the UK. Whether you need topographic surveys, PAS 128 utility mapping, or engineering consultancy, our team is here to provide industry-leading insight and results. Get in touch today to discuss your project needs.
office@kempengineering.co.uk
Redruth Office: 01209 214687
Exeter Office: 01392 716768






